SEARCH RESULTS
——
In the beginning, the pure manual delivery was 50,000 per person/day, semi-automated 200,000 per person/day, industrial 1.0, 800,000 per person/day, and industrial 1.5, 2.3 million per person/day.
查看详情
The ceramic assembly workshop has changed from 3,500 per person per person per day to 10,000 per day for automation. After continuous technological input, the ceramic assembly workshop has gradually changed from 1.0 15,000 per person per day to the span of 1.5 and 2.0 in the industry. 500,000 per person per day.
查看详情
In the beginning, the pure manual 30,000 per person/day, semi-automated 80,000 per person/day, industrial 1.0, 200,000 per person/day, and industrial 1.5, 1 million per person/day.
查看详情
In the beginning, the products were inspected and judged by pure handwork and personal work experience. Later, the unified quality management plan was adopted, and the 9000 certified system was studied and introduced power detectors, pressure devices, frequency resistant machines, power waveform detectors, etc. A series of testing equipment conducts unified and standardized quality management on products.
查看详情